Relocating a production line is not a transport job — it is an engineering project. The real risk is not moving iron; it is the weeks of lost output when a line does not restart as planned.
Fabrimove plans and executes complete production line relocations across Europe with one integrated team covering mechanical works, electrical installation and automation recommissioning, so your line reaches stable production on a committed date.
What is included?
Pre-move feasibility survey: Asset inventory, condition records, 3D measurements, transport and permit review.
Production-state documentation: parameter backups, PLC program backups, reference production video.
Controlled dismantling with match-marking, cable and pipe tagging, LOTO procedures.
Industrial packing and logistics coordination with bonded partners.
Foundations, alignment (laser-measured), utility reconnection at the new site.
Electrical reinstallation, PLC/controls recommissioning, safety validation.
Test runs, operator support and agreed ramp-up targets, closed with a joint acceptance protocol (SAT).
F.A.Q.
Typical mid-size lines: 2–4 weeks dismantling, 1–2 weeks transfer, 3–6 weeks reinstallation and commissioning. The survey gives you a committed, line-specific schedule.
We document the as-found production state before dismantling (parameters, backups, reference video) and commit to restoring it. Improvements beyond that are offered as a separate retrofit scope.
Yes — through vetted logistics and packing partners, coordinated by your Fabrimove project manager as part of the single contract.