Contact / RFQ

ServicesIndustrial Electrical Installation — From Transformer to Terminal

Behind every relocated or new production line is an electrical scope that decides the restart date.

Fabrimove‘s electrical teams — built on more than a decade of industrial contracting including MV substations up to 17 MVA plant electrification — deliver: Transformer and switchgear installation, MCC and control panel manufacturing and installation, cable trays and routing, field wiring, lighting and grounding, tested and documented to European standards (IEC/EN, measurement protocols included).

 

F.A.Q.

Yes — panels are built and FAT-tested in our own workshop, then installed and SAT-tested on site by the same team.

That is exactly our model. One contract covering mechanical, electrical and controls removes the interface risk that delays restarts.

Yes, with ATEX-trained personnel and appropriate certified material, subject to project review.

Planning a relocation or installation project? Request a feasibility survey — our engineers will assess your line on site and deliver a fixed-scope report within 10 days.